For this week we've finished the steering system drawing and assembling, changed the jack system placement and finished the 2D drawings to start producing the wooden/metal model. The motor propulsion system is fully modeled with an actuator on it. Below we can see the final design of the Bogie/Propulsion on the track:
So now the next step is to laser cut the wooden board at the college lab.
No comments:
Post a Comment